vtiger Forum Index vtiger
The Honest Open Source CRM
 

Alternative project module
Click here to go to the original topic

 
       vtiger Forum Index -> 3rd-Party Extensions
Previous topic :: Next topic  
Author Message
dubberdan



Joined: 13 Aug 2008
Posts: 63
Location: Deepest Darkest Wiltshire

Posted: Mon Aug 18, 2008 9:22 am    Post subject: Alternative project module  

I've had a look at the project module and it's good, but not what I need. What I'm looking for is something that combines some aspects of the project module with something like the ticket module. I'm thinking:

1. Create Projects, assigned to an account
2. Assign a contact for the account if needed
3. Create Jobs within the Project that need to be completed
4. Ability to add notes to the Jobs and Project as a whole
5. Optionally record other info for the Jobs and Project

Is there a way of doing this within vtiger with existing features/extensions?

If not, is this the sort of thing that someone could develop for me?
Back to top  
churchpath



Joined: 15 Oct 2007
Posts: 58

Posted: Mon Aug 18, 2008 10:20 am    Post subject: Re: Alternative project module - status in percentage  

If I add a STATUS custom percentage field to this module can anyone tell me how I can display it in ListView as a coloured percentage gauge?
How would I need to alter the code to achieve this?
That would be great to be able to view at a glance how the projects were progressing.
Many thanks,
Churchpath
Back to top  
 
       vtiger Forum Index -> 3rd-Party Extensions
Page 1 of 1


Powered by phpBB Search Engine Indexer
Powered by phpBB 2.0.15 © 2001, 2002 phpBB Group